Exclusively with permit in force!
This twin villa is ideally located in the heart of Grimisuat's new building zone, set in a recent villa neighborhood. Its privileged location offers unique comfort in the Valais thanks to optimal sunshine throughout the day and breathtaking views of the plain and mountains opposite. This mid-slope area is off-limits to all traffic except local residents, making it very quiet.
This villa faces south-west, giving it optimum sunshine all day long. The entrance is on the upper ground floor, with 3 bedrooms upstairs, including a master suite with shower room and access to the balcony. The lower ground floor features a beautiful living room with open kitchen, central island and pantry. This floor also offers a good-sized fourth bedroom.
- South-facing
- Unobstructed view with no overlooking
- Double terrace of 78 m2
- Fully independent house
- Finishes to choose from
- Cellar / laundry room / carport
Construction will start between December 2024 and February 2025, with delivery scheduled for spring 2026.
Finishings are at the purchaser's discretion
This twin villa is ideally located in the heart of Grimisuat's new building zone, set in a recent villa neighborhood. Its privileged location offers unique comfort in the Valais thanks to optimal sunshine throughout the day and breathtaking views of the plain and mountains opposite. This mid-slope area is off-limits to all traffic except local residents, making it very quiet.
This villa faces south-west, giving it optimum sunshine all day long. The entrance is on the upper ground floor, with 3 bedrooms upstairs, including a master suite with shower room and access to the balcony. The lower ground floor features a beautiful living room with open kitchen, central island and pantry. This floor also offers a good-sized fourth bedroom.
- South-facing
- Unobstructed view with no overlooking
- Double terrace of 78 m2
- Fully independent house
- Finishes to choose from
- Cellar / laundry room / carport
Construction will start between December 2024 and February 2025, with delivery scheduled for spring 2026.
Finishings are at the purchaser's discretion